Homes in Builth Wells (LD2) at a glance
This page summarises 1,759 energy performance certificates (EPCs) for homes in Builth Wells (LD2), using the most recent certificate for each home. 71% are rated D or lower, and 38% are rated E, F or G.
The median floor area is about 103 m².
Half of these certificates were issued in 2019 or later, so most describe homes as they are now or were within the last few years.
What kinds of homes are here
Detached and semi-detached homes account for 75% of certificates. These usually have room for an outdoor heat pump unit and a cylinder, but more exposed wall and roof area means insulation quality has a large effect on how well a heat pump performs.
Bungalows are 19% of the sample. They tend to have a large roof area relative to floor area, so loft insulation is usually worth checking first.
Who owns the homes here
Of the certificates that record tenure, 71% are owner-occupied homes, so most upgrade decisions here sit with the people who live in them. 18% are privately rented and 11% socially rented.
Walls and insulation
41% of the sampled homes have solid walls. These lose more heat than insulated cavity walls and cannot be filled like a cavity, so options are internal or external wall insulation, which cost more and take more planning. A heat pump can still work in a solid-wall home, but a proper heat-loss survey matters, and it is worth asking installers how they sized the system.
Much of that is stone rather than brick: 31% of homes have sandstone, limestone, granite or similar walls. Stone walls usually need breathable (vapour-open) insulation materials, so ask installers how they would handle moisture.
How homes are heated
Only 49% of homes here are recorded as using mains gas. The largest non-gas group is oil at 38%. Homes without mains gas are often the first to be advised to consider a heat pump, because the comparison is with oil, LPG or electric heating rather than cheap mains gas. Running costs still depend on insulation, tariff and how the system is designed.
3% of certificates already record a heat pump as the main heating, so there is some local precedent for neighbours to ask about.
When homes were built
43% of homes were built before 1930. Older homes are more likely to have solid walls, suspended timber floors and period features, and some may be in conservation areas or listed, which can affect what changes are permitted. It is worth checking this before getting quotes.
Lofts and windows
17% of homes with a roof of their own have no loft or roof insulation recorded, or less than 100 mm. For those homes a top-up to about 270 mm is the usual EPC recommendation.
18% of homes still have some single-glazed windows. In older or listed buildings, secondary glazing is often the permitted option.
Energy ratings
38% of certificates are rated E, F or G. Homes at the bottom of the scale usually have the most to gain from basic measures such as loft and wall insulation and draught-proofing, and the EPC recommendation list is a good place to start.
Improvements suggested for homes in Builth Wells (LD2)
Across the 1,759 certificates here, the improvements suggested most often are solar panels for electricity (82%), solar water heating (70%) and floor insulation (58%).
None of the certificates here suggests a heat pump, which says more about the assessment software than about the homes.
Solid wall insulation (internal or external) is suggested more often here than across Powys: on 39% of certificates, against 28%.
Ask an installer about solar panels insulation
Heat pump grants across Powys
Boiler Upgrade Scheme figures are published for local authorities, not postcode districts. Across Powys, 452 heat pump installations have had a grant paid (May 2022 to September 2026).
Installers in and around Builth Wells (LD2)
Companies House-registered installers listed for Builth Wells: 1 installer names Builth Wells on its own website as an area it covers, 4 installers have their registered office within 15 miles and 9 more say on their website that they work across Powys. 7 of the 14 mention heat pumps.
The typical firm has been trading for 11 years (the median, from Companies House incorporation dates).
The first listed are Smart Energy Systems Limited, Tipsgrove Eco Ltd and Simply Biomass Limited.
Smart Energy Systems Limited
Says it fits air source heat pump, ground source heat pump, air to air heat pump, solar PV, battery storage, underfloor heating, boilers
Says it holds MCS, NICEIC
Tipsgrove Eco Ltd
Says it fits air source heat pump, ground source heat pump, water source heat pump, air to air heat pump, solar PV, solar thermal, battery storage, biomass, boilers
Says it holds MCS, TrustMark, RECC, NAPIT
Simply Biomass Limited
Says it fits ground source heat pump, solar PV, solar thermal, battery storage, biomass, boilers
Says it holds APHC
Deri Allsop Limited
Jamie Howard Electrics Limited
Thermal Earth Limited
Says it fits air source heat pump, ground source heat pump, water source heat pump, solar PV, battery storage, underfloor heating, boilers
Says it holds MCS
RHW Renewable Heating Wales Ltd
Says it fits air source heat pump, ground source heat pump, solar PV, battery storage, biomass, underfloor heating, boilers
Says it holds MCS, RECC
Says it fits air source heat pump, solar PV, battery storage, boilers, cavity wall insulation, loft insulation, solid wall insulation
Says it holds MCS, TrustMark, HIES, Gas Safe, CHAS, Constructionline, PAS 2030, PAS 2035
Their website · More about Complete Remedial Solutions (CRS) Ltd
J N Cubbin Limited
Says it fits ground source heat pump, solar PV, solar thermal, underfloor heating
Martin Rees Electrical Contractors Limited
Says it fits solar PV, battery storage, EV charging, boilers
Says it holds MCS, TrustMark, RECC, NICEIC
New Dawn Energy Ltd
Says it fits solar PV, solar thermal, battery storage, EV charging
Says it holds MCS, Which? Trusted Trader
Dinefwr Electrical & Solar Ltd
Says it fits solar PV, battery storage, EV charging
Says it holds MCS, TrustMark, RECC, NAPIT
FLD Electrical Ltd.
Says it fits solar PV, solar thermal, battery storage, EV charging
Says it holds MCS, NICEIC, Constructionline
PAV Electrical Contractors Limited
Says it fits solar PV, battery storage, EV charging
Says it holds TrustMark, NAPIT
Listed from each firm's own website and from Companies House records (contains public sector information licensed under the Open Government Licence v3.0). Being listed is not a recommendation, and what firms say about themselves has not been checked: ask for an installer's MCS certificate number and consumer code membership before you sign anything.
How Builth Wells (LD2) compares with Powys
Homes built before 1930 are more common here than across Powys: 43% of certificates, against 32%.
Advice written for Powys as a whole may not fit Builth Wells on this point.
Builth Wells (LD2) and its neighbours
Llanwrtyd Wells (LD4) is about 7 miles away. Homes not on mains gas are more common there: 95% of certificates, against 51% in Builth Wells.
Llandrindod Wells (LD1) is about 8 miles away. Homes with solid walls are less common there: 26% of certificates, against 41% in Builth Wells.
Llanwrtyd Wells (LD5) is about 10 miles away. Homes not on mains gas are more common there: 77% of certificates, against 51% in Builth Wells.
How Builth Wells (LD2) ranks within Powys
Of the 18 Powys postcode districts with a page on this site, Builth Wells (LD2) has the lowest share of socially rented homes (11%).
Grants and support (Wales)
The Boiler Upgrade Scheme rules (who qualifies, what it covers and how the installer applies) are summarised on the Powys page, with a link to the official GOV.UK guidance.